Sustainable Solution in Claremont, NH

August 22, 2024 By Devon Pasco

Paper Fiber delivered to the stockpile location
The various topsoil ingredients
The Engineers decided to go with an inorganic geotextile mat for this project. RMI can manufacture an organic version of this mat for landfill closures as well.
Our old signature wild flower mix blooming
Vegetation growing on site after project completion
View of the closure from the wood line

RMI’s soil amendments are extremely versatile, and as such, we’ve supplied these recycled, sustainable materials for all kinds of unique projects throughout the Northeast. This year, we will be revisiting and sharing some of these engaging projects of the past as well as posting more of our current success stories!

Back in 2001, RMI was recommended to the city manager overseeing the closure of a landfill in Claremont, NH, who required approximately 25 acres worth of viable topsoil that could effectively cover and sustain hearty vegetative growth over the capped landfill. Topsoil used for a project of this caliber must be extremely erosion resistant to maintain the integrity of the site, especially if the land is sloped and/or located close to a body of water. We encountered some skepticism at first about our soil’s ability to meet the unique needs of the job. However, after learning that our Manufactured Topsoil would be erosion resistant enough on its own where an application of erosion control fabric would not be required, we were chosen for the job.

Staff at RMI managed the permitting and testing and created a material blend tailored to the exact nitrogen and long-term nutrient needs of the site. The closure required approximately 1350 cubic yards of topsoil per acre, placed to a depth of approximately nine inches over the geotextile mat. After planting a wildflower mix (our signature on jobs back in the day) a lively plant cover grew shortly after seeding, thriving with little additional input. Our manufactured topsoil excelled in this application and was estimated to have saved the city around $350,000.

Primary Sidebar

RMI Case Studies

  • Testimonials
  • Village at Old Mill
  • Prouty Gravel Pit
  • Mt. Toby Farm
  • Wilson Farm
  • Otter River Farm Composting
  • Charlton, MA Landfill Closure
  • Wastewater Treatment Composting Solutions
  • Slope Stabilization
  • Reclamation Services
  • Reclamation Services at Pike Industries
  • Reclamation Services at Lane Construction
  • Field Restoration Services

RMI Testimonials

Listen to what our clients say about RMI.

Solutions

  • Agricultural / Farmer Grower
  • Site Work / Gravel Pit Operator
  • Municipal Manager
  • Recycling / Supplier

Products

  • Biosolids
  • Paper Fiber
  • Paper Fiber Bedding
  • Wood Ash
  • High Carbon Wood Ash
  • Engineered Topsoil
  • Hydrosolids

Ask Our Experts

Contact Us
View Our Newsletters

1171 NH RT 175
Holderness, NH 03245

Phone: (603) 536-8900
Fax: (603) 536-8998
Email: RMI@rmirecycles.com

Connect with RMI

  • Facebook
  • LinkedIn
  • YouTube

Copyright © 2025 Resource Management, Inc. · Website by Wicked Good Web